Our News

 

Beautiful weather, views and ground conditions.

367m of pipe unrolled, fusion welded and ploughed in at 750mm cover in just under 4hrs as part of a drinking trough upgrade scheme.

We can achieve these high installation rates with minimal surface disruption using our specialist vibratory plough equipment.

For more information contact us online or call.

Www.stenlakes.co.uk

01566 773195 See MoreSee Less

2 weeks ago

Beautiful weather, views and ground conditions. 

367m of pipe unrolled, fusion welded and ploughed in at 750mm cover in just under 4hrs as part of a drinking trough upgrade scheme. 

We can achieve these high installation rates with minimal surface disruption  using our specialist vibratory plough equipment. 

For more information contact us online or call. 

Www.stenlakes.co.uk

01566 773195

 

Comment on Facebook

Just curious, are you able to fusion weld first then run the joint through the plough?

Not the best start to an installation day with roofs blown off and flooded excavations but come the end of the day another tank in the ground and all plumbed in.

#klargester #kingspan #stenlakesltd See MoreSee Less

2 months ago

Not the best start to an installation day with roofs blown off and flooded excavations but come the end of the day another tank in the ground and all plumbed in. 

#klargester #kingspan #stenlakesltd

 

Comment on Facebook

I bet I was fun towing that this morning

Load more